Site Search
News
- 18/08/2008 - Public Meeting for Small Boat Users
- 02/07/2008 - RUSSIAN OIL PRODUCERS INVITED TO ORKNEY
- 02/07/2008 - Presentation to retired Marine Officer
- 30/06/2008 - Orkney VTS - vhf ch 20 broadcasts

Notices
- 14/11/2008 - TGL’s tidal turbine tripod foundation at the EMEC tidal test site at the Fall of Warness
- 10/11/2008 - Graemsay Pier Lights
- 05/11/2008 - Recovery of mooring buoys – Fall of Warness
- 03/10/2008 - Oyster Power Capture Unit (PCU) Pipeline Installation
Shipping
Ships Expected
23/11/2008 - Orkney Spirit - Flotta Jetty
Ships in Port
06/09/2008 - Open Hydro Barge - Hatston 3
16/11/2008 - Ocean Prima - Anchor Scapa Flow
21/11/2008 - SKS Segura - STS 1
21/11/2008 - Stena Sirita - STS with SKS Segura.
Ships Sailed
20/11/2008 - Daroja - Hatston 2
Tingwall Terminal
59 05' 23"N 003 02' 25"W
Tel: 01856 872292/873636
Cargo handling : Ro-Ro
For berth availability call Orkney
Harbour radio on VHF ch 16/11 or
piermaster by telephone
Fresh water via 25mm hose.
The pier is of sheet pile and concrete construction with limited fendering available.
Fuel is available for members of
the Orkney Marine Fuel Co., from
a bunded tank located on the pier.
The hard ramp is used by the Ro-
Ro ferry.
For ferry time table see www.orkneyferries.co.uk


